About the Project
Ararat Rural City Council will reconstruct Buangor-Ben Nevis Road south of Warrak and strengthen/renew several major culverts and bridges along the road over next three years
Benefits
- A consistently wide, sealed road that allows two-way traffic along the entire route.
- Straighter road and better visibility to make driving safer.
- A stronger road surface designed to handle heavy vehicles.
- Upgraded bridges and culverts to improve reliability and reduce flood impacts.
- Safer travel overall for local residents, emergency services and businesses.
Funding
This project is funded by Safe System Road Infrastructure Program (SSRIP), with additional funding for bridge works sourced from the Roads to Recovery (R2R) program.
Media Updates
7 January 2026: Bridge at Warrak closed from 12 January 2026